Neat .. Is that the finger lakes Don ?
Lake Pleasant in Speculator NY.
Neat .. Is that the finger lakes Don ?
View attachment 7474 View attachment 7475 View attachment 7476 I started a unique project today.
200 yards of vinyl with 95 sheets (4’x4’) of underlayment. Oh... and it’s on an island.
The biggest shot was 13’2”x47’
We got all the materials out there and 1/2 of the underlayment installed , today
I feel like I was run over by a truck.
I’m pouring a couple of heinekens on my aching bones as we speak.
Getting ready to head over to my Coretec install and attempt to get some floor down. Earlier this week, I ground 20 lbs of concrete from a high spot, then put down 6 or 7 bags of Feather finish. Wavy gravy slab. I went over to get the starter rows in yesterday and part way through, I discovered another small high area near the corner of the room. I labeled and pulled my 4 starter rows off the floor, did some grinding and filling, so today, I will begin getting some flooring down. I was hoping to finish today or tomorrow, but that put's me a day behind. Renters are arriving Wednesday, so it needs to get wrapped up.
It's going slow because I'm net fitting two tiled walls that both have 3 foot wide steps.... net fitting close enough for a little grout caulk.
We got up there today and it was pouring rain.
I don’t have a good rain coat or pants, I made one out of a 55 gallon drum liner, cut out a head hole and 2 arm holes. I looked like a hefty guy wearing a hefty bag.
1/2 hour after we got to the island it was beautiful out for hours .
And of course it rained on the way back in .
The rest of the week is supposed to be nice .
Loch Ness monster.What you have floating in the water? Looks like a beaver.
That over 5 hours a week. You're saying I should demand overtime rates?If you worked more than one hour a day you'da been done by now.
I hope Daris has his glasses on when he reads that.......... or he's gonna get himself in trouble.Worked on my tilt trailer.
Enter your email address to join: