I've just laid a 3/4" hickory solid wood floor with glue assist on 3/4" plywood using staples and Loctite urethane adhesive applied in a serpentine pattern.
In another thread I was advise to save 5% or so extra flooring in the event board replacements are needed. My question is since the floor...
These replies lead me to ask a question on board replacement which I will ask in a new thread:
https://www.flooringforum.com/threads/3-4-t-g-board-replacement.6716/post-79379
We've laid the 3/4" hickory Mullican floor on the entire 1st floor (basement below) using staples and glue assist. Now there is a short, narrow hallway that is a step down from the floor. It is 36" wide by 8' long and is on a concrete slab.
How much trouble would I be in if I simple glued it...
I'm finishing up an installation of 5" hickory in our kitchen and I'm now at the toe kick course. I'm stapling and using serpentine urethane glue assist with not vapor barrier, per Mullican's instructions. How do I fasten the last course? I can't get anything in there to nail it. Can I simply...