I paid for the dumpster and some of the materials, but not the labor yet. We used a friend of my wife that is a house flipper - it was her crew. I warned the wife ahead of time that if things go south, she could lose a friend...
I already paid for a cleaning crew since it was unacceptable to...
We just had new LVP flooring installed on the entire first floor of the house - approximately 1200 sq ft. The original flooring was a mix of hardwood, tile, and carpet - all directly over a concrete base (house on a slab). The new flooring looks great but there are around 2 dozen (22+) soft...