Hi,
I'm having UFH gypsum overlay boards installed on an (insulated) concrete subfloor. UFH specaliststs have recommended using a self levelling compound before enginered wood floor is laid on top. They won't do the self levelling and carpenter won't do it, so I'm trying to figure out:
a)...