DIY LVP Install questions

Flooring Forum - DIY & Professional

Help Support Flooring Forum - DIY & Professional:

IncrdblHulk7

New Member
Joined
Jan 3, 2023
Messages
3
Location
08107
About to start flooring overhaul of the 1st floor of my 100+ yr old house. The house has gone through a couple of remodels over past few decades prior to my purchase that opened up the floor plan. The subfloor is the 5/8 1x4 pine boards shown in the attached picture. Bulk of the ~1100sq ft floor is covered with carpet or tile. Only the two corners of house were left exposed/stained. Because of the remodels (and viewing from basement) - the carpeted areas of floor have had a fair amount of patchwork. Floor does squeak in a few places under the carpeted areas.

So my plan is to install LVP across the entire floor. Sounds like I would do the following ...
1) remove baseboards, old carpet, and tile
2) screw down existing subfloor. Any advice on how many/spacing? only in areas of squeaks? I read somewhere that you need to insert 2 screws per board per joist. Seems like a lot.
3) install 1/2 or 5/8 plywood underlayment. Attach it ONLY to subfloor using 5/4 screws? advice on spacing?
4) check for level - if out, then tape plywood seams and use floor level compound.
5) install LVP
6) install baseboard and touchup

Am I missing anything? Any other advice?

Do you think I could break this 1st floor project into phases? therefore allowing me to more furniture from one quadrant of floor to another as I finish? Or is it better to tackle all at once since I want one continuous flow?

Thanks
 

Attachments

  • PXL_20230103_160706108.jpg
    PXL_20230103_160706108.jpg
    2.9 MB · Views: 0

Incognito

Professional
Pro
Joined
Jul 5, 2011
Messages
1,518
Location
Los Angeles, CA
Everything sounds good. By quadrants I suppose you mean cut the 1100 square foot into about 275 square foot quarters? I'd have to see where the walls fell out so it's possible that works but I'd advise you to work wall to wall in the direction of the planks-----in as large sections as you can. So maybe halfs or thirds if that's at all possible because you don't want that stagger pattern to stop til you cut into the walls. Hard to explain but maybe you can figure out why.
 

JPfloor

Supporting Member
Supporting Member
Joined
Feb 27, 2022
Messages
584
Location
New York
Also maybe if the floor needs any work to get it flat (fill in dips) do that before the new plywood goes down. Roofing shingles and felt paper can help. Shouldn’t be any need for tape on the seams of the new plywood.

I agree, If you can fit the furniture into half the room that would be easier than quadrants. Then you could complete your rows.

Around 8” apart on the screws should do it.
 

C.J.

Supporting Member
Supporting Member
Pro
Joined
Apr 23, 2021
Messages
2,977
Location
Over here now
100 year old house is gonna have something out of whack just cus it’s 100 years old. Sagging joists, settling, all kinds of fun to be had with old houses. Might not be a bad idea to check your floor for flatness first. You can use roofing felt, roofing shingles, door skins, 1/4” plywood… to build up any low areas first. Then you can cap over all that crap with a nice layer of plywood.

As far as breaking your 1st floor down into sections, how about renting a Uhaul for a week and just emptying out the entire first floor. $40 a day is what the big Uhauls are running. Might cost you a few hundred for the Uhaul, beer and pizza but you’ll appreciate it when you have room to maneuver and actually work in your own house cus dragging sheets of plywood around furniture and breakable stuff doesn’t sound like fun.
 

Incognito

Professional
Pro
Joined
Jul 5, 2011
Messages
1,518
Location
Los Angeles, CA
As far as breaking your 1st floor down into sections, how about renting a Uhaul for a week and just emptying out the entire first floor. $40 a day is what the big Uhauls are running. Might cost you a few hundred for the Uhaul, beer and pizza but you’ll appreciate it when you have room to maneuver and actually work in your own house cus dragging sheets of plywood around furniture and breakable stuff doesn’t sound like fun.

26' Truck​

26' Truck


Moving Type: 3 Bedroom Home to 4 Bedroom Home


  • Inside dimensions: 26'2" x 8'2" x 8'3" (LxWxH)
  • Door opening: 7'9" x 6'10" (WxH)
  • Deck height: 2' 11" Length 23'5"
  • EZ-Load Ramp

Rate $39.95
plus $1.09/mile
 

JPfloor

Supporting Member
Supporting Member
Joined
Feb 27, 2022
Messages
584
Location
New York
That’s a great idea!

But it does depend on where you are. Around here no commercial parking overnight. You might get away with one of those pods if you get a permit.

And moving everything outside and into a truck might be a lot more work than moving it side to side…😎
 
Last edited:

IncrdblHulk7

New Member
Joined
Jan 3, 2023
Messages
3
Location
08107
Back with more questions. Things got sidelined because getting some HVAC stuff taken care of before doing the floors. I think I could tackle the project in two waves, by moving major furniture from one side of house to other as we do floors.

So I have gotten a couple of quotes to see what it would cost to hire someone to do the job. To my surprise, both companies have suggested the following ... 1) both claim to have never added plywood underlayment over an old pine subfloor before and 2) both want to avoid ripping up the kitchen tile floor and instead want to build up entire floor to that height and LVP over it all.

So doing lots of reading, seems like screwing down old subfloor and adding 1/2 or 5/8 ply as underlayment is paramount to getting solid and flat base for LVP ... am I missing something? I get that ply by itself wont just make it flat ... it would require leveling either with compound or paper as we install it. Should I be leary of the idea to put LVP directly on old subfloor?

As for Kitchen ... the tile floor currently occupies maybe a 1/5th of the 1st floor. My thought was to rip it out and get back down to subfloor ... so that everything is on same thing. Building up to tile level seems like headache for doors, baseboard, and appliances. The one problem that the one contractor pointed out is that my kitchen cabinets were installed on TOP of the tile. I had not intended to remove the kitchen cabinets in this project. Do you think I could demo around base of cabinet OR will that be major pain? it looks to be to be 12x12 tile mortared to cement board which was nailed to subfloor. I think i could tackle ripping that up, but not sure how to best tackle cabinet area. any ideas?
 

JPfloor

Supporting Member
Supporting Member
Joined
Feb 27, 2022
Messages
584
Location
New York
Toe kick saw. This is a cheap model, there are better ones out there but if you’re only using it once… Get the right blade for ceramic/cement. It’s gonna make a dusty mess. A little water sprayed on and a shop vac will help.

 

JPfloor

Supporting Member
Supporting Member
Joined
Feb 27, 2022
Messages
584
Location
New York
If the cement board is just screwed down a crowbar should do the job. Just pry it up. Pull the screws after. If they mortared the cement board you’re going to want to use a demo hammer. Could be a real mess.
 

Latest posts

Top