Like my colleague here used to say, No Risk, No reward.
Pulled up laminate, and that ain't no carpet cushion. No moisture issues with the laminate either. Installed glued down horizontal carbonized bamboo with Bostik Ultra-Set Single Step.
Last pic is one of three smaller bedrooms that was installed and the rh was 98-100%, pegged CME. No cupping, no buckling. profiled slab to a csp-2-3 and let surface dry down as per Bostick Ultra-Set Single Step requirements ie; "dry to touch, no upper limit on moisture".
Pulled up laminate, and that ain't no carpet cushion. No moisture issues with the laminate either. Installed glued down horizontal carbonized bamboo with Bostik Ultra-Set Single Step.
Last pic is one of three smaller bedrooms that was installed and the rh was 98-100%, pegged CME. No cupping, no buckling. profiled slab to a csp-2-3 and let surface dry down as per Bostick Ultra-Set Single Step requirements ie; "dry to touch, no upper limit on moisture".
Last edited: