We're replacing the floors in our home, have decided on a stained concrete overlay, and have two quotes from local contractors.
One of the quotes is to grind, patch existing nail holes and such, and pour one ~1/16" layer of concrete. The second quote is to grind and pour three layers of concrete in varying levels of coarseness for a total thickness of ~1/4".
Any input as to which is a better option would be greatly appreciated.
Thanks.
One of the quotes is to grind, patch existing nail holes and such, and pour one ~1/16" layer of concrete. The second quote is to grind and pour three layers of concrete in varying levels of coarseness for a total thickness of ~1/4".
Any input as to which is a better option would be greatly appreciated.
Thanks.