So finally finishing this 1200 sf job.
Had to run the hallway in the back to get the laundry room done because the lady ordered appliances. Also had to wait for cabinets in kitchen otherwise i would have waited to lock in the wrap around.
Told them most likely would need a T-mold in this entry to kitchen.
But as luck has it it worked out. Only because this stuff is so flexable. Had to tilt the flooring to get it to lock in.
Flooring magic.
Had to run the hallway in the back to get the laundry room done because the lady ordered appliances. Also had to wait for cabinets in kitchen otherwise i would have waited to lock in the wrap around.
Told them most likely would need a T-mold in this entry to kitchen.
But as luck has it it worked out. Only because this stuff is so flexable. Had to tilt the flooring to get it to lock in.
Flooring magic.