Hello, glad to be here. I'm starting a shower remodel and already have a question. First of many im sure.
I have removed all the old tile and mortar bed and I'm planning on installing a new pre-slope, liner and mortar bed. Here is a look at the drain, is it ok that it is 1/2" below the slab? should I have a plumber or myself raise it to be level or slightly higher than the slab? I will do it if its not to hard, but will need instruction. Thanks
I have removed all the old tile and mortar bed and I'm planning on installing a new pre-slope, liner and mortar bed. Here is a look at the drain, is it ok that it is 1/2" below the slab? should I have a plumber or myself raise it to be level or slightly higher than the slab? I will do it if its not to hard, but will need instruction. Thanks
Last edited: