MikeAntonetti
Well-Known Member
In an ad I called a contractor that does grading, yada yada, I assumed my yard was flat but after tree removal with a track loader it’s very rough. So he came out looked it over and prior to locating topsoil the labor to dump qty10 18yd truckloads boxblading it, labor would be @ 6k $, for 4 acres, wow, another DIY project I guess. He hasn’t called back from locating topsoil, a rarity around here.