The whole thing is just a mockup?It has to be inspector level code only nothing matters unless the inspector says ok
The rails have to be five inches away from wall etc from beginning to end or maybe different distance depending on locale. This was and still is, a temporary railing in fact the white stuff and black stuff is all coming down . Special glass is being made for the railing and I am taking the carpet up and replacing it with LVT
View attachment 17627
Enter your email address to join: