Hi,
I know this has been probably discussed a bunch, but can someone please direct me to a video or written steps of how to get the lay the first few rows.
I'm installing click lock bamboo. The finished width of a board is 3 3/4"
I measured the width of the room in 3 spots and it measures ; 160 1/8", 160 1/4" & 160 3/8"
I have 2 heat ducts on the outside wall that I plan to start on.
I leave a 1/2 gap on all sides; correct?
Thank you
I know this has been probably discussed a bunch, but can someone please direct me to a video or written steps of how to get the lay the first few rows.
I'm installing click lock bamboo. The finished width of a board is 3 3/4"
I measured the width of the room in 3 spots and it measures ; 160 1/8", 160 1/4" & 160 3/8"
I have 2 heat ducts on the outside wall that I plan to start on.
I leave a 1/2 gap on all sides; correct?
Thank you